Causal Discovery for Resiliency-Prioritized Transmission Expansion Planning in Power Systems with Grid-Forming Inverter-Based Resources

Roy McCann, Mustafa Mhawesh, Sandra Canas Rivera

Abstract: Transmission planners at regional transmission organizations (RTOs), independent system operators (ISOs), and NERC-registered entities have limited analytical resources for exploring expansion options that improve resiliency for withstanding and recovering from fault conditions in electric power systems that are dominated by grid-forming (GFM) and grid-following (GFL) inverter-based resources (IBRs). Conventional existing TPL-001 contingency analysis will assess if a performance benchmark is violated. However, it will not identify which dynamic states and inputs caused the violation, nor how much a protective action will avoid propagation into a cascading outage. This paper proposes an analytical method that combines time-series causal discovery using the Peter and Clark Momentary Conditional Independence (PCMCI) algorithm with right/left eigenvector participation-factor analysis of validated small-signal state-space models. Synthetic data are generated from linearized models derived from substation phasor measurement unit (PMU) data. This includes node-breaker topologies under alternative transmission switching configurations. GFM and GFL inverter controls including phase-locked loops (PLLs) and fault ride-through logic. A planning index referred to as the Resiliency Causal Contribution Index (RCCI) is defined that weights PCMCI-derived causal effects on a TPL benchmark quantity by modal participation. The planning procedure iterates contingency categories, measures margins to RTO/ISO benchmarks for transient voltage recovery, oscillatory damping, inverter ride-through, and TPL-008-1 extreme temperature. The process infers automatic protective actions and repeats until a cascade is ruled out or confirmed. A simplified case study illustrates the entire process for considering the options in transmission expansion planning.

Submitted to arXiv on 15 Nov. 2026